Ok, long awaited status update. Went through and just check what I got so I can start getting a parts list together for the rest of the stuff I need. I will post the parts list up later tonight or tomorrow morning. Hope to have this back on the wheels by this weekend and get the sheet metal work done. Anybody in WA that wants to come over and help out you are more then welcome too. I will throw food on the grill and buy the beers. Current list of work still needed is as follows:
Put front cross member and suspension in
weld up rear rack and finish bolting up rear suspension
finish sheet metal work on rear strut towers
cut out and move front cross member forward a few inches
finish welding on the bracing
replace bad oil pump and bearings on rear engine
rebuild front engine
fabricate clutch cable and throttle cable shit
Install both engines and trannies
fabricate new rear shift linkage
come up with fuel tank/cell and plumb fuel pumps
build new dpfi->mpfi harness for front and undo old megasquirt wiring
build new wiring harness for rear
mount seats
do alignment
replace fucked up brakes
Profit