So I skipped taking a few pictures but, i got all the rockers and pushrods in, Valve covers painted and new gaskets in/on and bolted down, timing chain cover painted and lightly tightened down (still need to drive the balancer on b4 i crank it all the way down), Cleaned up the steam port caps and crossover and got those bolted down and last but not least I set the intake on to take a look at what it will look like when it's almost done.
Pic
Getting close now. Just need to put a freeze plug in intake manifold to plug the big egr hole in the side, and drill out the purge hole and rtv in my iat sensor, make a couple of fuel rail spacers and drop in my big injectors, bolt on my oil pan and rear main seal/cover oblong the holes in my flexplate for my converter to bolt to and the motor will be ready to drop in. Then it's trim and plate my shock towers and start fab on turbo shit.