Got some good and bad news.
The good:
Hallman in cab boost controller is installed
AEM progressive meth kit is installed
All front suspension work and brakes installed/blead
Tires bought
Shift kit goes in, in approx 12 days.
The bad:
Have to wait on new coils for the coilovers, spring rate is too soft
Retard with my rims, marked them as pool parts, and undervalued them. They got caught at customs in a random inspection. Looking at rims and reading pool parts doesn't add up. Along with the value. Retard I bought the rims from never told me he was going to pull a stunt like that, nor did I ask him too. Fuck brain. Sooo 9 day wait now.
Here are some pictures.